Skip Navigation Links

LUZMELLA HOSPITAL

Energy Manager HAZEM BQAEEN

We thank Kawkabuna for energy solutions for their help and support. They installed a new LED lighting system for the hospital and managed to reduce our electricity by 65% and a very attractive payback period of 6 months was achieved.

Kawkabuna also installed a Solar Thermal system to supply the hot water needed by the hospital. A tremendous reduction in the Diesel bill was saved which makes the payback period for our investment in the water heating system in less than 3 years.